Pack, Closure and Band Specification
Provide the production pack, closure and band specification together. Identify how each pack arrives and where the band should sit immediately after placement.

Plan routine production using tamper-evident shrink-band application around representative products, packs and packaging materials, line connections, operating limits, acceptance checks and next steps.
Assess routine shrink-band production using the actual pack, closure and band specification through feeding, cutting, placement and heat shrinking as one sequence. Record the required finished position and appearance, the effect on the product and pack, and the line spacing used during the trial.
Include replenishment, normal stops and recovery from missing or misplaced bands in the operating brief. The acceptance checklist separates the checks at application from the finished-pack result.
Use the same pack, closure and band specification for each observation. Record where the band sits before shrinking, the appearance of the finished pack and which results require someone to hold a pack for review.
Discuss your application

Provide the production pack, closure and band specification together. Identify how each pack arrives and where the band should sit immediately after placement.
List the pack and band combinations expected during normal production. Record which were actually trialled and which combinations still need a sample.
Agree the band position on the pack before shrinking and the acceptable appearance afterwards. Record both observations against the same pack and band combination.
State required output together with pack arrival, line spacing and the receiving operation. Include stops, replenishment and recovery in the trial record so accepted finished-pack output is distinguished from applicator cycles alone.
During a planned stop, identify the access needed to replenish bands or clean the line. Record which packs are checked when application and shrinking restart.
Define who examines missing, misplaced or poorly finished bands, where affected packs are held and what must be checked before accepted output resumes.
Include replenishment, normal production, planned change, short stops, fault recovery, cleaning and maintenance for routine production using tamper-evident shrink-band application. A fast automatic step can still leave your team with a slow or awkward overall process.
Run the agreed pack, closure and band combinations through application and shrinking at the intended production pattern. Record accepted packs, band placement before shrinking and finished appearance afterwards, including normal replenishment and interruptions.
Include representative pack and closure variations, band specifications and line-spacing conditions from the proposed scope. List combinations not trialled rather than assuming one acceptable result establishes the whole format range.
Agree how missing or misplaced bands will be identified, how affected packs will be handled and what must be checked before restart. Review the proposed recovery through an agreed assessment method; do not assume automatic detection or correction.
Compare with Short Runs and Format Changes Involving Tamper-Evident Shrink-Band Application if that operating pattern is closer to your application.