Pack, Closure and Band Specification
Identify the outgoing and incoming packs, closures and band specifications. Record which feeding, cutting or placement adjustments the change requires.

Plan short runs and format changes involving tamper-evident shrink-band application around representative products, packs and packaging materials, line connections, operating limits, acceptance checks and next steps.
For short runs, define the pack, closure and band combination used before and after each change. Review the adjustments, access and checks needed to restore the required feeding, cutting, placement and finished shrunk appearance.
Include the change itself and first-off checks in the trial, not just a run after setup is complete. The acceptance checklist helps record which formats and results have been demonstrated.
Record the last accepted pack of the outgoing format and the first accepted pack of the new format. Identify the band specification, expected position and appearance for both so the trial measures the actual change.
Discuss your application

Identify the outgoing and incoming packs, closures and band specifications. Record which feeding, cutting or placement adjustments the change requires.
List the pack, closure and band specification for each format and identify the expected sequence of changes. Keep supplier revisions and proposed formats separate from the representative combinations already trialled.
Set out the required position and appearance for each format. Inspect the first accepted new pack against its own agreed example after shrinking.
Time the change from the last accepted outgoing pack to the first accepted new pack. Record setup, replenishment, stops and the number of acceptable packs in the short run.
Identify the planned adjustments, band replenishment, cleaning and access work for each change. Agree the checks before routine production resumes and record any setup or shrinking question that still needs assessment.
Agree what happens to a pack with an absent or misplaced band after a format change, and what the operator checks before releasing the first acceptable packs.
Include replenishment, normal production, planned change, short stops, fault recovery, cleaning and maintenance for short runs and format changes involving tamper-evident shrink-band application. A fast automatic step can still leave your team with a slow or awkward overall process.
Trial an agreed change between representative pack, closure and band combinations, including the work before restart. Record first-off placement, finished appearance and any effect on the product or pack before judging the new format against its criteria.
Include credible extremes for tamper-evident shrink-band application product behaviour and container, bag or pack range.
Agree how a missing or misplaced band after a change will be identified and how affected packs will be handled. Review the restart checks and responsibilities without assuming a recipe selection alone confirms an acceptable setup.
Compare with Routine Production Using Tamper-Evident Shrink-Band Application if that operating pattern is closer to your application.